Integrated Delivery

Seattle Children
object(stdClass)#212 (8) {
  ["nid"]=>
  string(2) "46"
  ["node_title"]=>
  string(34) "Seattle Children's Bellevue Clinic"
  ["field_data_field_project_priority_field_project_priority_val"]=>
  string(1) "9"
  ["field_data_field_project_image_list_node_entity_type"]=>
  string(4) "node"
  ["field_data_field_project_location_node_entity_type"]=>
  string(4) "node"
  ["_field_data"]=>
  array(1) {
    ["nid"]=>
    array(2) {
      ["entity_type"]=>
      string(4) "node"
      ["entity"]=>
      object(stdClass)#200 (36) {
        ["vid"]=>
        string(2) "48"
        ["uid"]=>
        string(2) "28"
        ["title"]=>
        string(34) "Seattle Children's Bellevue Clinic"
        ["log"]=>
        string(0) ""
        ["status"]=>
        string(1) "1"
        ["comment"]=>
        string(1) "1"
        ["promote"]=>
        string(1) "0"
        ["sticky"]=>
        string(1) "0"
        ["nid"]=>
        string(2) "46"
        ["type"]=>
        string(15) "project_details"
        ["language"]=>
        string(3) "und"
        ["created"]=>
        string(10) "1349892704"
        ["changed"]=>
        string(10) "1617401056"
        ["tnid"]=>
        string(1) "0"
        ["translate"]=>
        string(1) "0"
        ["revision_timestamp"]=>
        string(10) "1617401056"
        ["revision_uid"]=>
        string(2) "78"
        ["body"]=>
        array(1) {
          ["und"]=>
          array(1) {
            [0]=>
            array(5) {
              ["value"]=>
              string(1067) "

The design and construction process for Seattle Children’s Bellevue Clinic (SCBC) was driven by Children’s Lean approach to patient care delivery, which eliminates waste and optimizes the process in order to produce the best possible results. SCBC is one of the first projects in Washington State to implement IPD (Integrated Project Delivery) and Lean design techniques. Building Information Modeling (BIM) was used to capture the design intent, and models were shared between the design team and construction team. The partnership between owner, design, and construction teams resulted in a culture of trust, respect, and collaboration that maximized value for the client’s budget while reducing construction time. This new 200,000 square-foot campus consists of an ambulatory surgery center and underground parking garage. The sloping site allows for parking space underneath the building while creating a landscaped plaza level above.

 

First Photo: Benjamin Benschneider

All Other Photos: Janette Ryan

" ["summary"]=> string(0) "" ["format"]=> string(9) "full_html" ["safe_value"]=> string(1045) "

The design and construction process for Seattle Children’s Bellevue Clinic (SCBC) was driven by Children’s Lean approach to patient care delivery, which eliminates waste and optimizes the process in order to produce the best possible results. SCBC is one of the first projects in Washington State to implement IPD (Integrated Project Delivery) and Lean design techniques. Building Information Modeling (BIM) was used to capture the design intent, and models were shared between the design team and construction team. The partnership between owner, design, and construction teams resulted in a culture of trust, respect, and collaboration that maximized value for the client’s budget while reducing construction time. This new 200,000 square-foot campus consists of an ambulatory surgery center and underground parking garage. The sloping site allows for parking space underneath the building while creating a landscaped plaza level above.

 

First Photo: Benjamin Benschneider

All Other Photos: Janette Ryan

" ["safe_summary"]=> string(2) " " } } } ["field_project_year"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(4) "2011" } } } ["field_project_category"]=> array(1) { ["und"]=> array(2) { [0]=> array(1) { ["tid"]=> string(1) "1" } [1]=> array(1) { ["tid"]=> string(2) "37" } } } ["field_project_image_list"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(3) "271" ["uid"]=> string(2) "32" ["filename"]=> string(45) "Bellevue Clinic and Surgery Center SQUARE.jpg" ["uri"]=> string(68) "public://projects/list/Bellevue Clinic and Surgery Center SQUARE.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(5) "77355" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1351305457" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(36) "Seattle Children's Center front door" ["title"]=> string(36) "Seattle Children's Center front door" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } } } ["field_project_gallery_images"]=> array(1) { ["und"]=> array(6) { [0]=> array(2) { ["value"]=> string(2) "16" ["revision_id"]=> string(2) "16" } [1]=> array(2) { ["value"]=> string(2) "60" ["revision_id"]=> string(2) "60" } [2]=> array(2) { ["value"]=> string(2) "78" ["revision_id"]=> string(2) "78" } [3]=> array(2) { ["value"]=> string(2) "79" ["revision_id"]=> string(2) "79" } [4]=> array(2) { ["value"]=> string(2) "80" ["revision_id"]=> string(2) "80" } [5]=> array(2) { ["value"]=> string(2) "81" ["revision_id"]=> string(2) "81" } } } ["field_project_featured_image"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(3) "101" ["uid"]=> string(2) "28" ["filename"]=> string(38) "featured_Seattle-Children's-Center.jpg" ["uri"]=> string(67) "public://projects/featured/featured_Seattle-Children's-Center_0.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(5) "65418" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1349892704" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "490" ["height"]=> string(3) "205" } ["alt"]=> string(39) "Seattle Children's Center exterior view" ["title"]=> string(39) "Seattle Children's Center exterior view" ["width"]=> string(3) "490" ["height"]=> string(3) "205" } } } ["field_project_features"]=> array(1) { ["und"]=> array(2) { [0]=> array(1) { ["target_id"]=> string(2) "21" } [1]=> array(1) { ["target_id"]=> string(3) "150" } } } ["field_project_priority"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(1) "9" } } } ["field_project_location"]=> array(1) { ["und"]=> array(1) { [0]=> array(3) { ["value"]=> string(12) "Bellevue, WA" ["format"]=> NULL ["safe_value"]=> string(12) "Bellevue, WA" } } } ["rdf_mapping"]=> array(9) { ["rdftype"]=> array(2) { [0]=> string(9) "sioc:Item" [1]=> string(13) "foaf:Document" } ["title"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(8) "dc:title" } } ["created"]=> array(3) { ["predicates"]=> array(2) { [0]=> string(7) "dc:date" [1]=> string(10) "dc:created" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["changed"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(11) "dc:modified" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["body"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(15) "content:encoded" } } ["uid"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:has_creator" } ["type"]=> string(3) "rel" } ["name"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(9) "foaf:name" } } ["comment_count"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:num_replies" } ["datatype"]=> string(11) "xsd:integer" } ["last_activity"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(23) "sioc:last_activity_date" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } } ["path"]=> array(1) { ["pathauto"]=> string(1) "1" } ["cid"]=> string(1) "0" ["last_comment_timestamp"]=> string(10) "1349892704" ["last_comment_name"]=> NULL ["last_comment_uid"]=> string(2) "28" ["comment_count"]=> string(1) "0" ["name"]=> string(12) "Ed Ouellette" ["picture"]=> string(1) "0" ["data"]=> string(4) "b:0;" } } } ["field_field_project_image_list"]=> array(1) { [0]=> array(2) { ["rendered"]=> array(5) { ["#theme"]=> string(15) "image_formatter" ["#item"]=> array(15) { ["fid"]=> string(3) "271" ["uid"]=> string(2) "32" ["filename"]=> string(45) "Bellevue Clinic and Surgery Center SQUARE.jpg" ["uri"]=> string(68) "public://projects/list/Bellevue Clinic and Surgery Center SQUARE.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(5) "77355" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1351305457" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(36) "Seattle Children's Center front door" ["title"]=> string(36) "Seattle Children's Center front door" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["#image_style"]=> string(19) "projects_list_thumb" ["#path"]=> array(2) { ["path"]=> string(7) "node/46" ["options"]=> array(2) { ["entity_type"]=> string(4) "node" ["entity"]=> object(stdClass)#207 (36) { ["vid"]=> string(2) "48" ["uid"]=> string(2) "28" ["title"]=> string(34) "Seattle Children's Bellevue Clinic" ["log"]=> string(0) "" ["status"]=> string(1) "1" ["comment"]=> string(1) "1" ["promote"]=> string(1) "0" ["sticky"]=> string(1) "0" ["nid"]=> string(2) "46" ["type"]=> string(15) "project_details" ["language"]=> string(3) "und" ["created"]=> string(10) "1349892704" ["changed"]=> string(10) "1617401056" ["tnid"]=> string(1) "0" ["translate"]=> string(1) "0" ["revision_timestamp"]=> string(10) "1617401056" ["revision_uid"]=> string(2) "78" ["body"]=> array(1) { ["und"]=> array(1) { [0]=> array(5) { ["value"]=> string(1067) "

The design and construction process for Seattle Children’s Bellevue Clinic (SCBC) was driven by Children’s Lean approach to patient care delivery, which eliminates waste and optimizes the process in order to produce the best possible results. SCBC is one of the first projects in Washington State to implement IPD (Integrated Project Delivery) and Lean design techniques. Building Information Modeling (BIM) was used to capture the design intent, and models were shared between the design team and construction team. The partnership between owner, design, and construction teams resulted in a culture of trust, respect, and collaboration that maximized value for the client’s budget while reducing construction time. This new 200,000 square-foot campus consists of an ambulatory surgery center and underground parking garage. The sloping site allows for parking space underneath the building while creating a landscaped plaza level above.

 

First Photo: Benjamin Benschneider

All Other Photos: Janette Ryan

" ["summary"]=> string(0) "" ["format"]=> string(9) "full_html" ["safe_value"]=> string(1045) "

The design and construction process for Seattle Children’s Bellevue Clinic (SCBC) was driven by Children’s Lean approach to patient care delivery, which eliminates waste and optimizes the process in order to produce the best possible results. SCBC is one of the first projects in Washington State to implement IPD (Integrated Project Delivery) and Lean design techniques. Building Information Modeling (BIM) was used to capture the design intent, and models were shared between the design team and construction team. The partnership between owner, design, and construction teams resulted in a culture of trust, respect, and collaboration that maximized value for the client’s budget while reducing construction time. This new 200,000 square-foot campus consists of an ambulatory surgery center and underground parking garage. The sloping site allows for parking space underneath the building while creating a landscaped plaza level above.

 

First Photo: Benjamin Benschneider

All Other Photos: Janette Ryan

" ["safe_summary"]=> string(2) " " } } } ["field_project_year"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(4) "2011" } } } ["field_project_category"]=> array(1) { ["und"]=> array(2) { [0]=> array(1) { ["tid"]=> string(1) "1" } [1]=> array(1) { ["tid"]=> string(2) "37" } } } ["field_project_image_list"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(3) "271" ["uid"]=> string(2) "32" ["filename"]=> string(45) "Bellevue Clinic and Surgery Center SQUARE.jpg" ["uri"]=> string(68) "public://projects/list/Bellevue Clinic and Surgery Center SQUARE.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(5) "77355" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1351305457" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(36) "Seattle Children's Center front door" ["title"]=> string(36) "Seattle Children's Center front door" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } } } ["field_project_gallery_images"]=> array(1) { ["und"]=> array(6) { [0]=> array(2) { ["value"]=> string(2) "16" ["revision_id"]=> string(2) "16" } [1]=> array(2) { ["value"]=> string(2) "60" ["revision_id"]=> string(2) "60" } [2]=> array(2) { ["value"]=> string(2) "78" ["revision_id"]=> string(2) "78" } [3]=> array(2) { ["value"]=> string(2) "79" ["revision_id"]=> string(2) "79" } [4]=> array(2) { ["value"]=> string(2) "80" ["revision_id"]=> string(2) "80" } [5]=> array(2) { ["value"]=> string(2) "81" ["revision_id"]=> string(2) "81" } } } ["field_project_featured_image"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(3) "101" ["uid"]=> string(2) "28" ["filename"]=> string(38) "featured_Seattle-Children's-Center.jpg" ["uri"]=> string(67) "public://projects/featured/featured_Seattle-Children's-Center_0.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(5) "65418" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1349892704" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "490" ["height"]=> string(3) "205" } ["alt"]=> string(39) "Seattle Children's Center exterior view" ["title"]=> string(39) "Seattle Children's Center exterior view" ["width"]=> string(3) "490" ["height"]=> string(3) "205" } } } ["field_project_features"]=> array(1) { ["und"]=> array(2) { [0]=> array(1) { ["target_id"]=> string(2) "21" } [1]=> array(1) { ["target_id"]=> string(3) "150" } } } ["field_project_priority"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(1) "9" } } } ["field_project_location"]=> array(1) { ["und"]=> array(1) { [0]=> array(3) { ["value"]=> string(12) "Bellevue, WA" ["format"]=> NULL ["safe_value"]=> string(12) "Bellevue, WA" } } } ["rdf_mapping"]=> array(9) { ["rdftype"]=> array(2) { [0]=> string(9) "sioc:Item" [1]=> string(13) "foaf:Document" } ["title"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(8) "dc:title" } } ["created"]=> array(3) { ["predicates"]=> array(2) { [0]=> string(7) "dc:date" [1]=> string(10) "dc:created" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["changed"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(11) "dc:modified" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["body"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(15) "content:encoded" } } ["uid"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:has_creator" } ["type"]=> string(3) "rel" } ["name"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(9) "foaf:name" } } ["comment_count"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:num_replies" } ["datatype"]=> string(11) "xsd:integer" } ["last_activity"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(23) "sioc:last_activity_date" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } } ["path"]=> array(1) { ["pathauto"]=> string(1) "1" } ["cid"]=> string(1) "0" ["last_comment_timestamp"]=> string(10) "1349892704" ["last_comment_name"]=> NULL ["last_comment_uid"]=> string(2) "28" ["comment_count"]=> string(1) "0" ["name"]=> string(12) "Ed Ouellette" ["picture"]=> string(1) "0" ["data"]=> string(4) "b:0;" } } } ["#access"]=> bool(true) } ["raw"]=> array(15) { ["fid"]=> string(3) "271" ["uid"]=> string(2) "32" ["filename"]=> string(45) "Bellevue Clinic and Surgery Center SQUARE.jpg" ["uri"]=> string(68) "public://projects/list/Bellevue Clinic and Surgery Center SQUARE.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(5) "77355" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1351305457" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(36) "Seattle Children's Center front door" ["title"]=> string(36) "Seattle Children's Center front door" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } } } ["field_field_project_location"]=> array(1) { [0]=> array(2) { ["rendered"]=> array(2) { ["#markup"]=> string(12) "Bellevue, WA" ["#access"]=> bool(true) } ["raw"]=> array(3) { ["value"]=> string(12) "Bellevue, WA" ["format"]=> NULL ["safe_value"]=> string(12) "Bellevue, WA" } } } }
Tacoma Dome Sports and Convention Center
object(stdClass)#213 (8) {
  ["nid"]=>
  string(3) "161"
  ["node_title"]=>
  string(40) "Tacoma Dome Sports and Convention Center"
  ["field_data_field_project_priority_field_project_priority_val"]=>
  string(1) "9"
  ["field_data_field_project_image_list_node_entity_type"]=>
  string(4) "node"
  ["field_data_field_project_location_node_entity_type"]=>
  string(4) "node"
  ["_field_data"]=>
  array(1) {
    ["nid"]=>
    array(2) {
      ["entity_type"]=>
      string(4) "node"
      ["entity"]=>
      object(stdClass)#198 (36) {
        ["vid"]=>
        string(3) "282"
        ["uid"]=>
        string(2) "32"
        ["title"]=>
        string(40) "Tacoma Dome Sports and Convention Center"
        ["log"]=>
        string(0) ""
        ["status"]=>
        string(1) "1"
        ["comment"]=>
        string(1) "1"
        ["promote"]=>
        string(1) "0"
        ["sticky"]=>
        string(1) "0"
        ["nid"]=>
        string(3) "161"
        ["type"]=>
        string(15) "project_details"
        ["language"]=>
        string(3) "und"
        ["created"]=>
        string(10) "1351830559"
        ["changed"]=>
        string(10) "1617402931"
        ["tnid"]=>
        string(1) "0"
        ["translate"]=>
        string(1) "0"
        ["revision_timestamp"]=>
        string(10) "1617402931"
        ["revision_uid"]=>
        string(2) "78"
        ["body"]=>
        array(1) {
          ["und"]=>
          array(1) {
            [0]=>
            array(5) {
              ["value"]=>
              string(1298) "

When the Tacoma Dome was constructed in 1983, it was the world’s largest wooden dome facility in the country. It was also one of the earliest and largest design-build competition projects in the nation. As the primary structural engineer for all structures supporting the timber-dome roof designed by Western Wood Structures, PCS—then Chalker Engineers—contained the base of the roof with a post-tensioned concrete tension ring. The timbers used to frame the roof were harvested from trees blown down due to eruption of Mt. St. Helens.

  Today, the Dome remains the largest indoor venue in Washington State, and PCS Structural Solutions continues to provide design expertise as the dome is continually improved to support new generations of patrons. In 2018, a $31-million renovation was completed which replaced the entire flexible seating system, added new concrete slabs throughout the majority of the building, replaced and increased floor-level restrooms, added custom high-end artist quarters upgrades and new loading docks, replaced cladding at the ticket booths, and designed upgrades to the MEP systems. New wood cladding at the exterior highlights a refresh of the Dome's appearance and complements the interior wood finishes and timber dome roof." ["summary"]=> string(0) "" ["format"]=> string(9) "full_html" ["safe_value"]=> string(1296) "

When the Tacoma Dome was constructed in 1983, it was the world’s largest wooden dome facility in the country. It was also one of the earliest and largest design-build competition projects in the nation. As the primary structural engineer for all structures supporting the timber-dome roof designed by Western Wood Structures, PCS—then Chalker Engineers—contained the base of the roof with a post-tensioned concrete tension ring. The timbers used to frame the roof were harvested from trees blown down due to eruption of Mt. St. Helens.

 
Today, the Dome remains the largest indoor venue in Washington State, and PCS Structural Solutions continues to provide design expertise as the dome is continually improved to support new generations of patrons. In 2018, a $31-million renovation was completed which replaced the entire flexible seating system, added new concrete slabs throughout the majority of the building, replaced and increased floor-level restrooms, added custom high-end artist quarters upgrades and new loading docks, replaced cladding at the ticket booths, and designed upgrades to the MEP systems. New wood cladding at the exterior highlights a refresh of the Dome's appearance and complements the interior wood finishes and timber dome roof.

" ["safe_summary"]=> string(2) " " } } } ["field_project_year"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(4) "2018" } } } ["field_project_category"]=> array(1) { ["und"]=> array(3) { [0]=> array(1) { ["tid"]=> string(2) "37" } [1]=> array(1) { ["tid"]=> string(1) "3" } [2]=> array(1) { ["tid"]=> string(2) "16" } } } ["field_project_image_list"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(4) "2461" ["uid"]=> string(2) "78" ["filename"]=> string(20) "Tacoma-Dome-List.jpg" ["uri"]=> string(43) "public://projects/list/Tacoma-Dome-List.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(6) "152353" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1616795306" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(40) "Tacoma Dome Sports and Convention Center" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } } } ["field_project_gallery_images"]=> array(1) { ["und"]=> array(6) { [0]=> array(2) { ["value"]=> string(3) "500" ["revision_id"]=> string(3) "500" } [1]=> array(2) { ["value"]=> string(3) "501" ["revision_id"]=> string(3) "501" } [2]=> array(2) { ["value"]=> string(3) "502" ["revision_id"]=> string(3) "502" } [3]=> array(2) { ["value"]=> string(3) "913" ["revision_id"]=> string(4) "1010" } [4]=> array(2) { ["value"]=> string(3) "914" ["revision_id"]=> string(4) "1011" } [5]=> array(2) { ["value"]=> string(4) "1053" ["revision_id"]=> string(4) "1297" } } } ["field_project_featured_image"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(4) "2462" ["uid"]=> string(2) "78" ["filename"]=> string(23) "Tacoma-Dome-Feature.jpg" ["uri"]=> string(50) "public://projects/featured/Tacoma-Dome-Feature.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(6) "115901" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1616795306" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "490" ["height"]=> string(3) "205" } ["alt"]=> string(40) "Tacoma Dome Sports and Convention Center" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["width"]=> string(3) "490" ["height"]=> string(3) "205" } } } ["field_project_features"]=> array(0) { } ["field_project_priority"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(1) "9" } } } ["field_project_location"]=> array(1) { ["und"]=> array(1) { [0]=> array(3) { ["value"]=> string(10) "Tacoma, WA" ["format"]=> NULL ["safe_value"]=> string(10) "Tacoma, WA" } } } ["rdf_mapping"]=> array(9) { ["rdftype"]=> array(2) { [0]=> string(9) "sioc:Item" [1]=> string(13) "foaf:Document" } ["title"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(8) "dc:title" } } ["created"]=> array(3) { ["predicates"]=> array(2) { [0]=> string(7) "dc:date" [1]=> string(10) "dc:created" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["changed"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(11) "dc:modified" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["body"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(15) "content:encoded" } } ["uid"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:has_creator" } ["type"]=> string(3) "rel" } ["name"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(9) "foaf:name" } } ["comment_count"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:num_replies" } ["datatype"]=> string(11) "xsd:integer" } ["last_activity"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(23) "sioc:last_activity_date" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } } ["path"]=> array(1) { ["pathauto"]=> string(1) "1" } ["cid"]=> string(1) "0" ["last_comment_timestamp"]=> string(10) "1351830559" ["last_comment_name"]=> NULL ["last_comment_uid"]=> string(2) "32" ["comment_count"]=> string(1) "0" ["name"]=> string(8) "Ted Ryan" ["picture"]=> string(1) "0" ["data"]=> string(24) "a:1:{s:7:"overlay";i:1;}" } } } ["field_field_project_image_list"]=> array(1) { [0]=> array(2) { ["rendered"]=> array(5) { ["#theme"]=> string(15) "image_formatter" ["#item"]=> array(15) { ["fid"]=> string(4) "2461" ["uid"]=> string(2) "78" ["filename"]=> string(20) "Tacoma-Dome-List.jpg" ["uri"]=> string(43) "public://projects/list/Tacoma-Dome-List.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(6) "152353" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1616795306" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(40) "Tacoma Dome Sports and Convention Center" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["#image_style"]=> string(19) "projects_list_thumb" ["#path"]=> array(2) { ["path"]=> string(8) "node/161" ["options"]=> array(2) { ["entity_type"]=> string(4) "node" ["entity"]=> object(stdClass)#201 (36) { ["vid"]=> string(3) "282" ["uid"]=> string(2) "32" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["log"]=> string(0) "" ["status"]=> string(1) "1" ["comment"]=> string(1) "1" ["promote"]=> string(1) "0" ["sticky"]=> string(1) "0" ["nid"]=> string(3) "161" ["type"]=> string(15) "project_details" ["language"]=> string(3) "und" ["created"]=> string(10) "1351830559" ["changed"]=> string(10) "1617402931" ["tnid"]=> string(1) "0" ["translate"]=> string(1) "0" ["revision_timestamp"]=> string(10) "1617402931" ["revision_uid"]=> string(2) "78" ["body"]=> array(1) { ["und"]=> array(1) { [0]=> array(5) { ["value"]=> string(1298) "

When the Tacoma Dome was constructed in 1983, it was the world’s largest wooden dome facility in the country. It was also one of the earliest and largest design-build competition projects in the nation. As the primary structural engineer for all structures supporting the timber-dome roof designed by Western Wood Structures, PCS—then Chalker Engineers—contained the base of the roof with a post-tensioned concrete tension ring. The timbers used to frame the roof were harvested from trees blown down due to eruption of Mt. St. Helens.

  Today, the Dome remains the largest indoor venue in Washington State, and PCS Structural Solutions continues to provide design expertise as the dome is continually improved to support new generations of patrons. In 2018, a $31-million renovation was completed which replaced the entire flexible seating system, added new concrete slabs throughout the majority of the building, replaced and increased floor-level restrooms, added custom high-end artist quarters upgrades and new loading docks, replaced cladding at the ticket booths, and designed upgrades to the MEP systems. New wood cladding at the exterior highlights a refresh of the Dome's appearance and complements the interior wood finishes and timber dome roof." ["summary"]=> string(0) "" ["format"]=> string(9) "full_html" ["safe_value"]=> string(1296) "

When the Tacoma Dome was constructed in 1983, it was the world’s largest wooden dome facility in the country. It was also one of the earliest and largest design-build competition projects in the nation. As the primary structural engineer for all structures supporting the timber-dome roof designed by Western Wood Structures, PCS—then Chalker Engineers—contained the base of the roof with a post-tensioned concrete tension ring. The timbers used to frame the roof were harvested from trees blown down due to eruption of Mt. St. Helens.

 
Today, the Dome remains the largest indoor venue in Washington State, and PCS Structural Solutions continues to provide design expertise as the dome is continually improved to support new generations of patrons. In 2018, a $31-million renovation was completed which replaced the entire flexible seating system, added new concrete slabs throughout the majority of the building, replaced and increased floor-level restrooms, added custom high-end artist quarters upgrades and new loading docks, replaced cladding at the ticket booths, and designed upgrades to the MEP systems. New wood cladding at the exterior highlights a refresh of the Dome's appearance and complements the interior wood finishes and timber dome roof.

" ["safe_summary"]=> string(2) " " } } } ["field_project_year"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(4) "2018" } } } ["field_project_category"]=> array(1) { ["und"]=> array(3) { [0]=> array(1) { ["tid"]=> string(2) "37" } [1]=> array(1) { ["tid"]=> string(1) "3" } [2]=> array(1) { ["tid"]=> string(2) "16" } } } ["field_project_image_list"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(4) "2461" ["uid"]=> string(2) "78" ["filename"]=> string(20) "Tacoma-Dome-List.jpg" ["uri"]=> string(43) "public://projects/list/Tacoma-Dome-List.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(6) "152353" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1616795306" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(40) "Tacoma Dome Sports and Convention Center" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } } } ["field_project_gallery_images"]=> array(1) { ["und"]=> array(6) { [0]=> array(2) { ["value"]=> string(3) "500" ["revision_id"]=> string(3) "500" } [1]=> array(2) { ["value"]=> string(3) "501" ["revision_id"]=> string(3) "501" } [2]=> array(2) { ["value"]=> string(3) "502" ["revision_id"]=> string(3) "502" } [3]=> array(2) { ["value"]=> string(3) "913" ["revision_id"]=> string(4) "1010" } [4]=> array(2) { ["value"]=> string(3) "914" ["revision_id"]=> string(4) "1011" } [5]=> array(2) { ["value"]=> string(4) "1053" ["revision_id"]=> string(4) "1297" } } } ["field_project_featured_image"]=> array(1) { ["und"]=> array(1) { [0]=> array(15) { ["fid"]=> string(4) "2462" ["uid"]=> string(2) "78" ["filename"]=> string(23) "Tacoma-Dome-Feature.jpg" ["uri"]=> string(50) "public://projects/featured/Tacoma-Dome-Feature.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(6) "115901" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1616795306" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "490" ["height"]=> string(3) "205" } ["alt"]=> string(40) "Tacoma Dome Sports and Convention Center" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["width"]=> string(3) "490" ["height"]=> string(3) "205" } } } ["field_project_features"]=> array(0) { } ["field_project_priority"]=> array(1) { ["und"]=> array(1) { [0]=> array(1) { ["value"]=> string(1) "9" } } } ["field_project_location"]=> array(1) { ["und"]=> array(1) { [0]=> array(3) { ["value"]=> string(10) "Tacoma, WA" ["format"]=> NULL ["safe_value"]=> string(10) "Tacoma, WA" } } } ["rdf_mapping"]=> array(9) { ["rdftype"]=> array(2) { [0]=> string(9) "sioc:Item" [1]=> string(13) "foaf:Document" } ["title"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(8) "dc:title" } } ["created"]=> array(3) { ["predicates"]=> array(2) { [0]=> string(7) "dc:date" [1]=> string(10) "dc:created" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["changed"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(11) "dc:modified" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } ["body"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(15) "content:encoded" } } ["uid"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:has_creator" } ["type"]=> string(3) "rel" } ["name"]=> array(1) { ["predicates"]=> array(1) { [0]=> string(9) "foaf:name" } } ["comment_count"]=> array(2) { ["predicates"]=> array(1) { [0]=> string(16) "sioc:num_replies" } ["datatype"]=> string(11) "xsd:integer" } ["last_activity"]=> array(3) { ["predicates"]=> array(1) { [0]=> string(23) "sioc:last_activity_date" } ["datatype"]=> string(12) "xsd:dateTime" ["callback"]=> string(12) "date_iso8601" } } ["path"]=> array(1) { ["pathauto"]=> string(1) "1" } ["cid"]=> string(1) "0" ["last_comment_timestamp"]=> string(10) "1351830559" ["last_comment_name"]=> NULL ["last_comment_uid"]=> string(2) "32" ["comment_count"]=> string(1) "0" ["name"]=> string(8) "Ted Ryan" ["picture"]=> string(1) "0" ["data"]=> string(24) "a:1:{s:7:"overlay";i:1;}" } } } ["#access"]=> bool(true) } ["raw"]=> array(15) { ["fid"]=> string(4) "2461" ["uid"]=> string(2) "78" ["filename"]=> string(20) "Tacoma-Dome-List.jpg" ["uri"]=> string(43) "public://projects/list/Tacoma-Dome-List.jpg" ["filemime"]=> string(10) "image/jpeg" ["filesize"]=> string(6) "152353" ["status"]=> string(1) "1" ["timestamp"]=> string(10) "1616795306" ["type"]=> string(5) "image" ["rdf_mapping"]=> array(0) { } ["image_dimensions"]=> array(2) { ["width"]=> string(3) "320" ["height"]=> string(3) "320" } ["alt"]=> string(40) "Tacoma Dome Sports and Convention Center" ["title"]=> string(40) "Tacoma Dome Sports and Convention Center" ["width"]=> string(3) "320" ["height"]=> string(3) "320" } } } ["field_field_project_location"]=> array(1) { [0]=> array(2) { ["rendered"]=> array(2) { ["#markup"]=> string(10) "Tacoma, WA" ["#access"]=> bool(true) } ["raw"]=> array(3) { ["value"]=> string(10) "Tacoma, WA" ["format"]=> NULL ["safe_value"]=> string(10) "Tacoma, WA" } } } }

Pages