EQC Fife Parking Garages

2008

These two new 1,000-stall parking garages at Emerald Queen Casino Fife each consist of five levels of parking with iconic CMU and glass elevator towers and vestibules.  The design schedule was condensed and the permit drawings were ready within five weeks of notice to proceed. The construction schedule was also fast tracked, and PCS worked hand in hand with the contractor to accomplish a six-month construction schedule for each garage, with parking opening on the lower levels as the upper levels were being constructed. The garage incorporated an exterior moment frame system allowing for an open, wall-free garage for added security and visibility.

 