MultiCare Good Samaritan Hospital Expansion

2019

When Good Samaritan Hospital's Dally Tower was originally built, the 7th and 8th floors were left unfinished until the hospital was ready to fill the empty space. The $44.5 million buildout of these floors in 2019 added a total of 80 acute care beds, allowing the hospital's post-surgical care unit to move to Dally Tower.
 
photography by Nathaniel Willson Photography